Cox Lane in Chessington will be shut on Sunday morning by the railway bridge to allow Network Rail contractors to chop down a 'dangerous tree'.

The road through the industrial estate will be shut both ways from 6am to 2pm at the bridge for safety reasons.

Traffic will be diverted but emergency vehicles will still be able to drive under the bridge.